MEGAWIDE Construction Corp. is targeting the first quarter of 2027 to begin construction of its P1.19-billion Baguio City transport terminal project, a companyMEGAWIDE Construction Corp. is targeting the first quarter of 2027 to begin construction of its P1.19-billion Baguio City transport terminal project, a company

Megawide to start Baguio terminal construction next year

2026/04/06 00:03
2 min read
For feedback or concerns regarding this content, please contact us at crypto.news@mexc.com

MEGAWIDE Construction Corp. is targeting the first quarter of 2027 to begin construction of its P1.19-billion Baguio City transport terminal project, a company official said.

“The next step is the design phase. So, now, we are starting that process. It is very challenging because of the terrain. We are finding the most efficient way to design it,” Megawide Chief Business Development Officer Jaime Raphael C. Feliciano told reporters on the sidelines of an event on March 11.

In January, the company signed a lease agreement with the Baguio City Government to implement the project, following the receipt of the notice of award last year.

“We are hoping by Q1 of next year we can start (construction). We just have two challenges right now,” he said.

Mr. Feliciano said one challenge is the transfer of the waste-sorting facility at the site, which the city must relocate after identifying a new location.

Megawide is also arranging temporary housing for about 27 families who will be affected by the project.

“We will provide them temporary housing or shelter. We will also find ways for them to be able to work in the project, for example construction or supervisors or whatever their skill sets allow them,” he said.

The project is expected to be operational by the second half of 2028, Mr. Feliciano added.

The Baguio City Integrated Terminal is designed to handle up to 25,000 passengers daily and will initially serve seven southbound routes, including La Union, Pangasinan, Tarlac, Pampanga, Bulacan, Metro Manila, and Cavite via the planned South Luzon Integrated Terminal Exchange.

The terminal will be built on a five-hectare property in Barangay Dontogan, about five kilometers from Baguio City proper.

The project is expected to ease traffic congestion in the city by relocating provincial buses and UV Express vans outside the central district. — Ashley Erika O. Jose

Market Opportunity
Manchester City Fan Logo
Manchester City Fan Price(CITY)
$0.5163
$0.5163$0.5163
+0.50%
USD
Manchester City Fan (CITY) Live Price Chart
Disclaimer: The articles reposted on this site are sourced from public platforms and are provided for informational purposes only. They do not necessarily reflect the views of MEXC. All rights remain with the original authors. If you believe any content infringes on third-party rights, please contact crypto.news@mexc.com for removal. MEXC makes no guarantees regarding the accuracy, completeness, or timeliness of the content and is not responsible for any actions taken based on the information provided. The content does not constitute financial, legal, or other professional advice, nor should it be considered a recommendation or endorsement by MEXC.

You May Also Like

Trump’s Hormuz Ultimatum Sends Oil Past $110, Highest Since March

Trump’s Hormuz Ultimatum Sends Oil Past $110, Highest Since March

The post Trump’s Hormuz Ultimatum Sends Oil Past $110, Highest Since March appeared on BitcoinEthereumNews.com. Oil prices extended gains in early Asian trading
Share
BitcoinEthereumNews2026/04/06 09:54
Foreigner’s Lou Gramm Revisits The Band’s Classic ‘4’ Album, Now Reissued

Foreigner’s Lou Gramm Revisits The Band’s Classic ‘4’ Album, Now Reissued

The post Foreigner’s Lou Gramm Revisits The Band’s Classic ‘4’ Album, Now Reissued appeared on BitcoinEthereumNews.com. American-based rock band Foreigner performs onstage at the Rosemont Horizon, Rosemont, Illinois, November 8, 1981. Pictured are, from left, Mick Jones, on guitar, and vocalist Lou Gramm. (Photo by Paul Natkin/Getty Images) Getty Images Singer Lou Gramm has a vivid memory of recording the ballad “Waiting for a Girl Like You” at New York City’s Electric Lady Studio for his band Foreigner more than 40 years ago. Gramm was adding his vocals for the track in the control room on the other side of the glass when he noticed a beautiful woman walking through the door. “She sits on the sofa in front of the board,” he says. “She looked at me while I was singing. And every now and then, she had a little smile on her face. I’m not sure what that was, but it was driving me crazy. “And at the end of the song, when I’m singing the ad-libs and stuff like that, she gets up,” he continues. “She gives me a little smile and walks out of the room. And when the song ended, I would look up every now and then to see where Mick [Jones] and Mutt [Lange] were, and they were pushing buttons and turning knobs. They were not aware that she was even in the room. So when the song ended, I said, ‘Guys, who was that woman who walked in? She was beautiful.’ And they looked at each other, and they went, ‘What are you talking about? We didn’t see anything.’ But you know what? I think they put her up to it. Doesn’t that sound more like them?” “Waiting for a Girl Like You” became a massive hit in 1981 for Foreigner off their album 4, which peaked at number one on the Billboard chart for 10 weeks and…
Share
BitcoinEthereumNews2025/09/18 01:26
Iran mediators propose 45-day ceasefire amid low US-Iran resolution odds: FT

Iran mediators propose 45-day ceasefire amid low US-Iran resolution odds: FT

The post Iran mediators propose 45-day ceasefire amid low US-Iran resolution odds: FT appeared on BitcoinEthereumNews.com. Iranian mediators propose a 45-day ceasefire
Share
BitcoinEthereumNews2026/04/06 10:15

$30,000 in PRL + 15,000 USDT

$30,000 in PRL + 15,000 USDT$30,000 in PRL + 15,000 USDT

Deposit & trade PRL to boost your rewards!